The Nu-Bolt assembly is available in standard sizes from 2 inches to 36 inches. For larger diameter pipe, custom sizes are avialable.
The Cross-linked Polyolefin (Heat Shrink)prevents damage to the pipe coating during installation.
Nu-Bolt installed on a vertical pipe. The first platform to spec Nu-Bols for a new build was in 1989.
A nice clean crevice, with no water entrapment.
Crevice corrosion occurs when water is trapped between the pipe and the support. I-Rod keeps the pipe dry.
This operator keeps spare Nu-Bolts of various sizes in stock right on the platform.
Some of the very first Nu-Bolts to be installed. You can see that these have even been painted over at least once.
I-Rod by itself can be used as a beam dressing.