Concrete about to be poured, after the anodes have been placed.
A graphic showing the SmartMat installed on a pipeline, connected by two RetroClamps.
Mattress stabilizing a pipeline at a river crossing.
The mattress segments withstand harsh conditions.
A wire rope is cast through each block, electrically connecting the anodes together.
SmartMats shown on the barge, on the way to deployment.
The connections to the lifting frame.
Two SmartMat sections connected with polymer bands, used to "anchor" a pipeline.
SmartMat shown on the sea floor.
The aluminum anode, once cast inside the mattress segment.
The mattress segments can be fitted with a rubber pad, which aids in one of the primary applications, pipeline crossings.
SmartMat being installed at a river crossing.
SmartMat segments allow the mat to be built to any dimensions.
SmartMat segments shown here connected together, stored stacked eight mats high.
SmartMats shown on the truck, prior to being loaded onto the barge.
Each segment easily connects to one another.
3 long Mats shown in the yard.
Testing the continuity of the anode inside the Mat segment..